This 7,500 sq. ft. ground up construction included cast in place concrete foundations, slab on grade, extensive site work and steel framed superstructure.  The facade included masonry and insulated metal panels.  The roof was a mix of membrane and standing seam metal.  The interior fit out included offices, holding cells, dispatch and security areas, and gym and locker facilities.

Project was completed ahead of schedule inclusive of hazardous material coordination and maintaining present operations through course of construction.

OWNER:

MassDOT.

ARCHITECT:

Austin Architects

COMPLETION DATE:

2016

LOCATION:

Weston, MA

SIZE:

7,500 sq. ft. - New Ground Up State Police Barracks

COST:

$4.7MM